Bedding Material For Construction
132 Bedding and backfill materials Materials for duct bedding and backfill including their compaction requirements shall be as shown on the Drawings.
Bedding material for construction. Up to 40 Off Selected Items - Until Stocks Last. Determine the pH and resistivity of water and soil in conformance with AS 1289431 and AS 1289441. Bedding material and compaction should comply with the project specific drawings.
Especially where unusual ground conditions may occur. As a result materials once in abundant supply are becoming scarce or unobtainable. Embedment The embedment is the soil placed to support the load on the pipe.
B Material replacing unsuitable material 95 C22008 c Bedding material 95 C22008 d Selected backfill and ordinary backfill material. Strain on the supply of litter materials. In wet conditions and where the trench bottom is firm a 12 -16mm Aggregate may be used for the bedding material.
Bedding Material Material suitable for use in the Foundation Bedding Zone of culverts and for bedding of pipes conduits pits and so on. Type 2 Bedding 4. If the foundation is unsuitable it must be removed and replaced with a suitable material.
A on the Site outside the excavation lines or b an area off the Site which can be developed by the Contractor as a source of Borrow Material. Humes recommend consulting with the project engineer for bedding material and compaction requirements. All orders shipped within one business day.
Borrow Area An area. Ballast for railway construction and maintenance. Type 1 Bedding shall consist of a clean course sand or recycled glass free from organic matter clay shells and deleterious material with 100 passing the 67mm AS sieve and not more than 5 passing a 0150 mm AS sieve.

